Al Fajar Transport · KSA

Every shift change covered, on the hour, all year.

Contracted worker transport for factories, plants and industrial sites across the Kingdom — three-shift rotations, night and Friday cover, accommodation-to-gate runs, standby vehicles held for breakdowns, and a manifest for every movement. A line does not stop because a coach did not arrive.

  • 24/7 shift operation
  • Standby vehicles held
  • Fixed monthly price

Contract at a glance

Patterns
Two and three-shift rotations, 12-hour swings, continuous 7-day
Zones
Jeddah · Riyadh · Dammam · Jubail · Yanbu · Rabigh industrial cities
Vehicles
11 to 49 seats, assigned to your site
Headcount
From 30 workers to several thousand
Cover
Standby vehicles, night and holiday shifts
Billing
One monthly invoice with a shift-by-shift log

Send the shift pattern and headcount — costed proposal back within one working day.

Request a proposal
  • TGA-licensed operator
  • Seat belts and speed governors fitted
  • VAT invoicing, CR verifiable
  • Coordinator on call through the night

Shift patterns · four common shapes

Built around the rotation, not office hours.

Industrial transport is a different operation from office duty. The vehicle has to be at the gate as one shift walks out and the next walks in, at two in the afternoon and at ten at night, every day of the year.

Three-shift rotation

Six, two and ten, or whatever your plant runs. Each change is two movements — the outgoing shift home and the incoming shift in — timed so neither group waits at a gate in the heat or the dark.

  • Six movements daily
  • 24/7
  • Night cover
SAR 13,500From, per vehicle / month

Two-shift or 12-hour swing

Day and night crews on twelve-hour swings, including the weekly changeover when both crews move on the same day. Common in food processing, packaging and warehousing.

  • Four movements daily
  • Changeover day
  • 7-day option
SAR 11,000From, per vehicle / month

Accommodation-to-plant line haul

Labour accommodation to the industrial city and back, often forty to eighty kilometres each way. Coaches sized so nobody stands, with a fixed boarding sequence at the camp.

  • Long haul
  • Coach fleet
  • Camp boarding plan
SAR 18,000From, per vehicle / month

Overtime, callout & shutdown

Extra movements for overtime crews, unplanned callouts and turnaround or shutdown periods when headcount triples for three weeks — booked against the same contract and the same invoice.

  • On demand
  • Surge capacity
  • Same account
Per movementQuoted on request
Office hours rather than shifts?

Fixed morning and evening runs for corporate staff, multi-point district pick-ups and management duty vehicles are covered on our Monthly Staff Duty page. Many clients run both contracts side by side on one account.

Included in the monthly price

What keeps the rotation running.

A shift contract is judged on the nights nobody notices it. Everything below sits inside the monthly figure rather than appearing as a variation order the first time something goes wrong.

  • Standby vehicles, not promises

    Reserve capacity is held against your contract and can be parked on or near site for larger operations. A coach failing at 21:40 does not become a late shift change at 22:00.

  • Seat belts, speed governors, no standing

    Vehicles are specified to industrial HSE expectations: a seat and a belt for every worker, governed speed, and passenger numbers that never exceed the seat count.

  • Drivers inducted to your site

    Site safety induction, gate passes, permits and vehicle stickers completed during mobilisation, so no driver is turned back at security on the first night.

  • A manifest for every movement

    Headcount recorded on and off at each boarding point, so your HSE and HR teams can account for who travelled on which vehicle, on which shift, on any date.

  • Journey plans on long hauls

    Accommodation-to-plant routes are planned with agreed roads, rest arrangements and driving-hour limits, in the shape most industrial clients already require of their contractors.

  • The same drivers on your rotation

    Drivers are assigned to your site and to a shift, not rotated weekly. They know the gate, the boarding sequence and the supervisors, which is what makes a 22:00 change take four minutes.

  • Night coordination that answers

    A coordinator is awake and reachable at every hour your plant runs, including Fridays and the Eid holidays. Nothing waits for an office to open.

  • Fuel, tolls, maintenance and insurance

    Inside the monthly figure, with the driver's salary, visa and accommodation. Maintenance is scheduled around your rotation rather than against it.

Shutdowns, turnarounds and ramp-ups

Tell us your turnaround window when the contract is set up and the surge is planned into the year rather than scrambled for in the week before. Additional vehicles during a shutdown are charged per movement against the existing contract, with no new agreement to sign.

Pricing basis · per vehicle, per month

How a shift contract is costed.

Priced per vehicle per month against your rotation, inclusive of driver, fuel, tolls, maintenance and insurance. Indicative starting figures for a continuous operation — your proposal is costed against your actual shift times, distances and headcount.

Factory shift transport · SAR per vehicle, from
Vehicle Seats Typical shift use From / month
Toyota Hiace 11 Small crews, technicians, callout cover 8,500
Toyota Coaster 30 The standard shift-change vehicle 13,500
49-seat coach 49 Accommodation-to-plant line haul 18,000
GMC Yukon XL 6 Supervisors, HSE rounds, site patrol 8,000
Toyota Camry or Hyundai Sonata 4 Engineers and staff moving independently 5,000
Standby coach, held on contract 30–49 Reserve cover for breakdowns and surges On request

Figures assume a continuous seven-day operation within one industrial zone. Long-haul accommodation routes, a dedicated standby vehicle, Friday and holiday cover and shutdown surges are costed separately and shown as their own lines in the proposal.

A plant moving 300 workers on three shifts typically runs four to five Coasters with one standby. Send the rotation and we will size it precisely rather than approximately.

Cost my rotation

How a contract starts · four stages

Mobilised before the first night shift.

Industrial contracts carry more setup than office ones — inductions, gate passes and a journey plan. Ten to fourteen days from agreement is typical, and we will tell you honestly if your date is not achievable.

  1. Stage 01

    Site and rotation survey

    Shift times, headcount per shift, accommodation locations, gate access, road restrictions and any HSE requirements your contractors must meet.

  2. Stage 02

    Costed proposal and journey plan

    Vehicles per movement, boarding sequence, routes and timings, with a fixed monthly figure back within one working day.

  3. Stage 03

    Mobilisation

    Drivers inducted, gate passes and permits issued, vehicles stickered and inspected, and a dry run of the first shift change before go-live.

  4. Stage 04

    Operation and review

    Running with a named night-capable coordinator, monthly invoice with the movement log, and a quarterly review as headcount and rotations change.

Safety and service commitments

The standards your HSE team will ask about.

These are written into the agreement and evidenced on request — the answers most industrial clients need before a contractor is allowed through the gate.

Safety and service standards
Commitment Standard
Seating and restraints One seat and one belt per worker — standing passengers are never carried
Speed control Governors fitted to coaches and buses, with speed reports available on request
Driver licensing and hours TGA driver cards, defensive-driving briefed, driving hours managed against the rotation
Vehicle at the gate Ten minutes before each shift change, every movement
Breakdown cover Standby vehicle deployed within 45 minutes in-zone, faster where a vehicle is held on site
Coordinator response Within 15 minutes at any hour, including nights, Fridays and Eid
Incident reporting Written report to your HSE contact within 24 hours of any incident, however minor
Vehicle condition Nothing older than six years, daily checks, air-conditioning verified before summer
Documentation Licence, insurance, CR, VAT, driver IDs and inductions kept current in your contractor file

Why plants change contractor

A late coach is a late line.

In an office, a transport failure is an irritation. On a production site it is a shift that starts thirty minutes down, a crew that cannot leave until their relief arrives, and an HSE incident waiting at a gate in the dark. Industrial clients do not move contractor because of price. They move because somebody did not turn up at 22:00 and nobody answered the phone.

  • Owned fleet, real reserve

    Standby capacity only means something if the vehicle exists and is ours. A broker subcontracting your night shift cannot hold a spare coach for you at ten at night.

  • We run nights properly

    Night work is not a day operation stretched late. Drivers are rostered for it, coordination is staffed for it, and the 02:00 movement gets the same attention as the 06:00 one.

  • An HSE file that passes audit

    Seat belts, governors, driver cards, inductions, incident reporting and current certificates — assembled the way your contractor audit expects to receive them.

  • A movement log finance can audit

    Every shift change recorded by date, vehicle, route and headcount. The monthly invoice reconciles to the log rather than to a single figure taken on trust.

  • Workers treated properly

    Air-conditioning that works in August, a seat for everyone, and drivers who do not rush a boarding to make up time. How a contractor treats a night crew tells you what else they cut.

  • The price is fixed for the term

    One monthly figure for the contract period, with surge work priced per movement at rates agreed up front. No fuel surcharge, no seasonal adjustment in month three.

References

Ask the sites already running with us.

Client references, safety records and sample movement logs are available during procurement, including sites running comparable rotations in your industrial zone.

Awaiting approval
Reserved for an approved client quote. Published only with the client's written consent.
Operations manager, manufacturing plant Jeddah Industrial City
Awaiting approval
Reserved for an approved client quote. Published only with the client's written consent.
HSE lead, petrochemical contractor Yanbu
Awaiting approval
Reserved for an approved client quote. Published only with the client's written consent.
Contracts engineer, industrial services Jubail

Contract enquiry · proposal within one working day

Send the rotation and the headcount.

Shift times, worker numbers and where they are picked up from is enough to cost a contract properly. Nothing is charged at enquiry, and we will tell you plainly if your site is better served another way.

Request a costed proposal

About two minutes. Fields marked optional can be left blank.

Open now
What you are looking for
Your site
Accommodation, camp or districts — we plan the boarding sequence from this.
The rotation
Contract, vehicles and site requirements
How to reach you

No commitment at enquiry · proposal within one working day

Enquiry received

A contracts coordinator will come back with a costed proposal and a draft journey plan, normally within one working day. For anything urgent, call us on +966500000000.

Shift transport contract questions

What plants ask before awarding.

Anything not here, ask the contracts team directly — someone answers at any hour, including through the night shift.

Can you cover night shifts and Friday changeovers?

Yes, and that is most of this work. Drivers are rostered specifically for nights rather than stretched from a day roster, and a coordinator is awake at every hour your plant runs, including Fridays and the Eid holidays.

What happens if a coach fails before a shift change?

A standby vehicle is deployed, within 45 minutes in-zone and faster where a vehicle is held on your site. Reserve capacity is held against your contract because the fleet is owned rather than brokered.

Do your vehicles meet industrial HSE requirements?

Seat belts for every passenger, speed governors on coaches and buses, no standing passengers, daily checks and TGA-carded drivers briefed on defensive driving. Certificates and speed reports are provided for your contractor file.

How do you handle gate passes, permits and site inductions?

During mobilisation. Driver IDs, iqamas and licences go into your security file, vehicle plates are registered, stickers issued and site safety inductions completed before the first shift change rather than at the gate on the first night.

Can you scale up for a shutdown or turnaround?

Yes. Tell us the window when the contract is set up and the surge is planned into the year. Additional vehicles are charged per movement at rates agreed in advance, on the same contract and invoice.

Do you record who travelled on each movement?

Yes. Headcount is recorded on and off at each boarding point, and the movement log behind your monthly invoice shows date, shift, vehicle, route and numbers carried — which is what HSE and HR usually need after the fact.

How far do you run from labour accommodation?

Routine accommodation-to-plant routes run to eighty kilometres each way, and longer is quoted with a journey plan covering roads, rest arrangements and driving-hour limits. Distance affects the price but not the standard.

How quickly can a shift contract start?

Ten to fourteen days from agreement in most cases, which allows for inductions, gate passes, vehicle stickering and a dry run of the first shift change. Urgent cover can move faster where vehicles and cleared drivers are available.

Reviewing your shift transport contract?

Send the rotation, the headcount and where your workers are picked up from. A costed proposal with vehicles, boarding sequence and a fixed monthly figure comes back within one working day.

WhatsApp